Painting a condo is not technically harder than painting an HDB flat. What makes it harder is everything that happens before the first coat: permits, deposits, working-hour restrictions and the management office.
Start with the renovation permit
Nearly every MCST requires a permit for painting works, even where no hacking is involved. Applications typically need the contractor's details, insurance particulars and a work schedule. Allow one to two weeks.
Expect a refundable deposit
Most managements hold a deposit against damage to common property, refunded after a post-works inspection. Your contractor should be handling this paperwork, not you.
Working hours are non-negotiable
Typical windows are weekdays 9am to 5pm and Saturday mornings, with no work on Sundays or public holidays. This is the single biggest driver of how long a condo repaint takes.
Lift and common area protection
Lift protection panels and corridor floor coverings are usually mandatory. Debris must be removed daily rather than stored in the corridor.
Choose finishes for the exposure
West-facing units and those near the coast need anti-mould and moisture-resistant systems. A standard emulsion will blister within a couple of years in those conditions.
We handle the permit, the deposit forms and the protection requirements as part of every condo job — so you deal with us, not the management office.
0 Comments
Leave a Comment
Your email is never published. Comments appear after moderation.